Consort Place, Canary Wharf — Aspen Tower
BIM Management · Canary Wharf

Consort Place

Canary Wharf, London · Far East Consortium · GDV £470m

3
Towers
65 / 34 / 20
Storeys
£470m
GDV
MEP BIM
Scope
About the Scheme

Three Towers. One Basement. One BIM Manager.

Consort Place is a major mixed-use high-rise development at Canary Wharf — three towers of 65, 34 and 20 storeys above a shared basement: Aspen (495 apartments), Alta (139 affordable homes) and the Dorsett Hotel (231 rooms). Developer: Far East Consortium (FEC). GDV £470m.

UD BIM provided BIM management for MEP across the whole scheme, with Ugur Duru as BIM Manager — leading the coordination of mechanical, electrical and plumbing services across all three towers and the shared basement.

The Challenge

Three towers, one basement, multiple MEP contractors

MEP services running through three structurally distinct towers and a shared basement — with multiple contractors, tight floor-to-ceiling heights and a complex programme to manage.

What We Did

Senior-led MEP BIM management end-to-end

Weekly coordination, systematic clash detection across all disciplines, model health monitoring and direct client reporting — keeping MEP aligned with structure and architecture throughout.

Project Summary
LocationCanary Wharf, London
DeveloperFar East Consortium (FEC)
GDV£470m
TowersAspen (65 fl) · Alta (34 fl) · Dorsett Hotel (20 fl)
Units495 apts + 139 affordable + 231 hotel rooms
UD BIM ScopeMEP BIM Management
UD BIM RoleBIM Manager — Ugur Duru
Technical Detail
ToolsRevit · Navisworks · Autodesk BIM 360
StandardsISO 19650 · UK BIM Framework
DisciplinesMEP · Structural · Architectural
TypeMixed-use high-rise
Scope of Work

What UD BIM Delivered

  • Full MEP BIM management across all three towers and shared basement
  • Multidiscipline coordination — MEP aligned with structural and architectural models
  • Systematic clash detection and resolution before works reached site
  • Weekly coordination meetings chaired and managed by Ugur Duru
  • Model health checks and quality monitoring throughout programme
  • ISO 19650 compliant information management and CDE oversight
  • Direct reporting to client and project stakeholders
What This Means For You

On a scheme this complex — three towers, one basement, multiple MEP contractors — BIM management isn't administration. It's the layer that keeps services coordinated, programme protected and unexpected site costs off the table.