Thames City Phase 2, Nine Elms
DfMA Modelling · Nine Elms

Thames City Phase 2

Nine Elms, London · CC Land / R+F Properties

608
Homes
5
Buildings
12–22
Storeys
DfMA
Scope
About the Scheme

Design to Manufacture in a Single Workflow

Thames City is a major residential development at Nine Elms, London. Phase 2 delivers 608 homes across five buildings ranging from 12 to 22 storeys, developed by CC Land and R+F Properties.

UD BIM delivered the modelling for the project's PUC (Prefabricated Utility Cupboard) modular units. For each PUC we produced both a Revit model and an Autodesk Inventor model, then generated coordination drawings and production drawings directly from them — bridging design and manufacturing in a single integrated workflow.

The Challenge

Bridging BIM design and off-site manufacturing

The PUC units needed to be designed for coordination in Revit, but also modelled in Inventor for fabrication. Getting both outputs from one consistent source of truth — without duplication or error — was the core challenge.

What We Did

Revit + Inventor integrated DfMA workflow

UD BIM modelled each PUC unit in both Revit (design coordination) and Inventor (fabrication-ready output), then generated coordination and production drawings directly. One workflow, design to manufacture.

Project Summary
LocationNine Elms, London
DeveloperCC Land / R+F Properties
Homes608 across 5 buildings
Heights12 to 22 storeys
UD BIM ScopePUC DfMA Modelling
Technical Detail
ToolsRevit · Autodesk Inventor
StandardsISO 19650
OutputCoordination + production drawings
MethodOff-site / modular (DfMA)
PUC modular unit — Revit model
PUC modular unit — Revit coordination model
Scope of Work

DfMA Workflow — Step by Step

  • Revit model of each PUC unit for design coordination
  • Autodesk Inventor model for fabrication-ready output
  • Coordination drawings generated directly from models
  • Production drawings for off-site manufacture
  • Single integrated workflow from design intent to manufacturing output
What This Means For You

Modular and DfMA projects need models that work for both design coordination and factory production. UD BIM bridges that gap — one team, one workflow, Revit and Inventor — so drawings come from a single source of truth.

See Also

Related Projects

Get In Touch

Need DfMA or Modular Modelling?

Tell us about your project — we'll advise on Revit, Inventor and the right DfMA workflow.