Ferry Island, Tottenham Hale
Information Management & COBie · Tottenham Hale

Ferry Island

Tottenham Hale, London N17 · Midgard

484
Homes
38
Storeys
£600m
Regeneration
COBie
Scope
About the Scheme

Structured Asset Information for Handover at the Heart of Hale

Ferry Island is the final phase of the £600m Heart of Hale regeneration in Tottenham Hale — one of North London's most significant residential-led transformation projects. The development delivers 484 homes across two buildings, one rising to 38 storeys, alongside ground-floor retail, shared amenity space and a cinema.

UD BIM delivered information management and COBie data preparation for the project's handover stage. We structured and validated the asset information to ISO 19650 and COBie requirements, and coordinated delivery through the project's common data environment — giving the client a clean, standards-compliant information set for operation and FM handover.

The Challenge

Clean COBie data for a complex mixed-use scheme

A 484-home scheme with mixed uses, multiple asset types and a tight handover programme demands structured, validated information — not a data dump. Getting to a COBie-compliant, ISO 19650-ready handover set requires discipline and a clear process.

What We Did

ISO 19650 information management & COBie preparation

UD BIM structured and validated the asset information to ISO 19650 and COBie requirements, coordinating delivery through the CDE to produce a complete, standards-compliant handover information set — ready for operation from day one.

Project Summary
LocationTottenham Hale, London N17
ClientMidgard
Homes484 across 2 buildings
HeightUp to 38 storeys
Scheme£600m Heart of Hale regeneration
UD BIM ScopeInformation Management & COBie
Technical Detail
StandardsISO 19650 · COBie
StageHandover
OutputValidated handover information set
DeliveryCDE-coordinated
Scope of Work

Information Management Through to Handover

  • Asset information structured and validated to ISO 19650 requirements
  • COBie data preparation for standards-compliant handover
  • Delivery coordinated through the project's common data environment
  • Quality assurance and validation of the full information set
  • Complete, operation-ready handover package for the client
What This Means For You

A well-structured handover information set protects the client's investment long after construction ends. UD BIM's information management work ensures that asset data is complete, validated and structured from the outset — reducing the cost and risk of gaps at handover and making the building easier to operate from day one.