London Trocadero, Coventry Street, West End
MEP Design Modelling · West End

London Trocadero

7–14 Coventry Street W1D · Criterion Capital · Hotel Conversion

LOD 300
Model Level
W1D
West End Location
MEP Design
Scope
Hotel
Conversion Type
About the Scheme

MEP Modelling at the Heart of London's West End

The London Trocadero at 7–14 Coventry Street, W1D is one of central London's most prominent entertainment buildings — being transformed by Criterion Capital into a hotel, repositioning the landmark site in the heart of the West End between Piccadilly Circus and Leicester Square.

UD BIM delivered the MEP design modelling for the conversion. Working from design information, we produced LOD 300 Revit models covering the full MEP scope: HVAC systems, drainage, and cable containment — providing the coordination geometry the design team needed to develop the MEP services.

The Challenge

Accurate MEP geometry for a complex heritage conversion

The Trocadero's existing building fabric — floor plates, ceiling voids, riser locations — shapes every MEP decision in a hotel conversion. Modelling services at LOD 300 in this context requires precision and coordination with the architectural and structural teams.

What We Did

LOD 300 MEP models across HVAC, drainage and cable containment

UD BIM produced the MEP design models in Revit — HVAC systems, drainage routes and cable containment — at LOD 300, providing geometry the team could coordinate against and take forward into detailed design.

Project Summary
Location7–14 Coventry Street, London W1D
DeveloperCriterion Capital
ConversionEntertainment venue → Hotel
AreaWest End, between Piccadilly Circus & Leicester Square
UD BIM ScopeMEP Design Modelling
Technical Detail
ToolsRevit
StandardsISO 19650
LODLOD 300
SystemsHVAC · Drainage · Cable Containment
Scope of Work

What UD BIM Delivered

  • LOD 300 Revit MEP design models for the hotel conversion
  • HVAC system modelling — routing and coordination geometry
  • Drainage system modelling throughout the building
  • Cable containment modelling — routes and sizing
  • Model coordination with architectural and structural teams
  • ISO 19650 compliant model delivery
What This Means For You

MEP design modelling at LOD 300 gives the whole design team a shared, coordinated picture of how services route through the building before detailed design is locked in. On a complex conversion like the Trocadero, that coordination geometry resolves conflicts before they become problems.